🏷️
Networking Workshop: 3rd floor
Hands-on tech meetup at Hackeriet: check cabling, trace the uplink and swap in a Cisco switch for the 3rd floor network.
In the planning workshop (see below) an initial spec for the three upper floors was outlined together with resilience goals. https://pad.hackeriet.no/rewire-hausmania#Discussion-phase First order of affairs is replacing the 3rd floor switch/AP setup. We will check state of cables, find the uplink, and try to replace the switch in-place with a Cisco switch.

