Open presentation of Dow Jones Architects' sensitive low‑carbon restoration of the 1866 listed St Mark's Schoolhouse
Restoration of St Mark's Schoolhouse:
REUSE
When we bought St Mark’s Schoolhouse the windows and doors were smashed in, rotten, and covered with plywood. The roof was deteriorating, all of the external walls were severely cracked (you could get your arm through one of them) and the north side of the building was held up by scaffolding. Our project to save St Mark's School re-activates this charming derelict listed building and showcases a low carbon approach to heritage.
This is a comprehensive yet sensitive restoration that uses reversible techniques and like-for-like repairs to retain the character of the listed building. The project is highly sustainable, focusing on high levels of insulation, improved air tightness, and low carbon heating. The restoration of the whole site and re-instatement of the wall and railings elevates the streetscape and dramatically improves what was a well-known local eyesore. The works have secured the building for decades to come and have removed it from Historic England’s Heritage at Risk register.
EXISTING FABRIC
We have undertaken a wide range of fabric repairs on a ‘like for like’ basis using traditional materials and techniques, and married that to modern technologies to ensure the stability of the building.
NEW FABRIC - FLOOR
We took up the existing timber floorboards and joists, and replaced the floor with an independent concrete floor slab so that we can reduce the loading on the external walls to reduce the possibility of further movement of the north wall. We used the same method that we developed at the Garden Museum, which is to consolidate the ground in the floor void, lay insulation, a DPM and a new floor slab. The slab is reversible as it will be independent of the listed fabric, separated by a continuous strip of insulation at the interface with the existing walls.
NEW FABRIC – WALLS
We have insulated the building from the inside by building an independent timber frame inside the existing brick walls. This independent frame is insulated beyond current building regulation requirements. The timber frame sits on the new concrete floor slab and avoids loading the existing fabric and to reduce the possibility of further movement of the north wall. This is also an entirely reversible approach as the independent timber frame can be removed and the existing interior revealed.
NEW FABRIC – ROOF
The existing roof timbers provide a lot of the character of the existing building, so the decision was made to insulate the roof externally so the charm of the timbers could be retained. Again, the roof is insulated beyond current building regulation requirements to reduce operational carbon.
NEW FABRIC - REBUILT LEAN-TO
The existing lean-to structure to the west of the building contains the west porch, a small room, a small yard and the wc. This was taken down and rebuilt as this construction had an enormous crack in the external wall. Our new structure retained the current pitched roof to the por